Cladding & Facades Method Statements & Risk Assessments
Facade work draws close attention post-Grenfell, and reviewers now expect the RAMS to address material specification and fire performance during construction alongside the physical installation risk. Panel handling at height in wind is the operational risk that gets picked apart.
Activities covered
Each document is written for the specific activity, site and programme — not adapted from a template for the trade.
Hazards the assessment must address
- Falls from height at open facades and leading edges
- Dropped panels, glazing and components
- Wind loading on large panels during handling
- Glazing breakage and cutting injury
- Mast climber and cradle failure or entrapment
- Manual handling of heavy and awkward units
- Fire risk from combustible materials during construction
- Vacuum lifter failure during glazing installation
- Interface with scaffold and other trades at the facade
Regulations that apply
Why cladding & facade RAMS get rejected
These are the findings that come up repeatedly on the reviewing side for this trade. If your document has been returned, the reason is very likely in this list.
Already been rejected? Send the document and the reviewer's comments. We diagnose exactly why it failed, rewrite it against your site information, and support the resubmission until it is accepted — at no extra charge.
The lifting element people miss
Facade panels, glazing units and curtain walling cassettes are lifted into position — usually by crane or vacuum lifter, often in wind-sensitive conditions. That element needs planning under LOLER 1998 by a competent person and is a routine rejection point when omitted.
See our mobile crane lift plansGet a quote for cladding & facade RAMS
07803 8080933 fields, 30 seconds. We reply within 4 working hours.
Other trades we write for
Method statements and risk assessments across the full range of construction activities.
Need cladding & facade RAMS that get accepted?
Fixed price, quoted the same day, written to the standard principal contractors review against.