Groundworks & Excavation Method Statements & Risk Assessments
Groundworks RAMS are rejected more often than almost any other trade, and usually for the same two reasons: the buried services regime is described generically rather than against the actual site drawings and scan results, and the excavation support arrangements are asserted rather than specified. Principal contractors scrutinise this package hard, because struck services and collapsed excavations are the incidents that kill people on their site.
Activities covered
Each document is written for the specific activity, site and programme — not adapted from a template for the trade.
Hazards the assessment must address
- Contact with buried services — electricity, gas, water, telecoms
- Excavation collapse and entrapment
- Persons and plant falling into excavations
- Plant / pedestrian interface and blind spots
- Confined space atmospheres in deep excavations and chambers
- Contaminated ground and hazardous substances
- Water ingress, flooding and unstable ground
- Undermining adjacent structures and foundations
- Overhead services during plant slewing and tipping
Regulations that apply
Why groundworks RAMS get rejected
These are the findings that come up repeatedly on the reviewing side for this trade. If your document has been returned, the reason is very likely in this list.
Already been rejected? Send the document and the reviewer's comments. We diagnose exactly why it failed, rewrite it against your site information, and support the resubmission until it is accepted — at no extra charge.
The lifting element people miss
Groundworks method statements very often include lifting that the writer has not recognised as lifting — placing drainage pipes, chambers, headwalls or cages with an excavator brings the operation under LOLER 1998. That is a routine rejection point, and one we cover as a matter of course.
See our excavator lift plansGet a quote for groundworks RAMS
07803 8080933 fields, 30 seconds. We reply within 4 working hours.
Other trades we write for
Method statements and risk assessments across the full range of construction activities.
Need groundworks RAMS that get accepted?
Fixed price, quoted the same day, written to the standard principal contractors review against.