Concrete Works & Temporary Works Method Statements & Risk Assessments

Concrete and temporary works RAMS fail most often on the interface with the temporary works procedure — reviewers look for evidence that a Temporary Works Coordinator has been engaged and that designs, checks and permits to load and strike are built into the sequence. A method statement that treats formwork as just another material rarely survives review.

24–48hr turnaround
18-point compliance standard
Resubmission included

Activities covered

Each document is written for the specific activity, site and programme — not adapted from a template for the trade.

Formwork and falsework erection and striking
Reinforcement fixing and placement
Concrete placement — pump, skip and direct discharge
Slipform and jumpform operations
Precast erection and grouting
Curing, testing and finishing
Post-tensioning operations
Temporary works propping and back-propping

Hazards the assessment must address

  • Formwork or falsework collapse during pour
  • Premature striking before design strength achieved
  • Falls from height at edges, voids and rising formwork
  • Concrete pump line blockage and whipping
  • Cement burns, dermatitis and eye injury
  • Silica dust from cutting, grinding and scabbling
  • Reinforcement impalement and protruding bars
  • Manual handling of formwork panels and rebar
  • Post-tensioning strand release and stressing zone risk

Regulations that apply

BS 5975Code of practice for temporary works procedures — TWC and TWS roles, design and permits.
CDM 2015Contractor planning duties and structural stability requirements.
Work at Height Regulations 2005Edge protection at slab edges, voids and rising formwork.
COSHH 2002Cement, silica dust, release agents and admixtures.
PUWER 1998Concrete pumps, vibrators, power floats and cutting equipment.
LOLER 1998Skips, formwork panels and precast units lifted into position.

Why concrete & temporary works RAMS get rejected

These are the findings that come up repeatedly on the reviewing side for this trade. If your document has been returned, the reason is very likely in this list.

No reference to the temporary works register, design brief or TWC sign-off
Striking times stated as fixed periods with no reference to cube results or design
Permit to load and permit to strike not built into the sequence
Pour rate and pressure not addressed against the formwork design
Silica dust from cutting and scabbling not assessed under COSHH
Edge protection at rising slab edges described generically
Concrete pump siting, outrigger loading and ground bearing not covered
Back-propping arrangements missing where floors are loaded early

Already been rejected? Send the document and the reviewer's comments. We diagnose exactly why it failed, rewrite it against your site information, and support the resubmission until it is accepted — at no extra charge.

The lifting element people miss

Skips, formwork panels, rebar cages and precast units are all lifted, which brings LOLER 1998 into play. Where the RAMS describes craneage we produce the accompanying lift plan so the two documents agree.

See our lift plan writing

Get a quote for concrete & temporary works RAMS

07803 808093

3 fields, 30 seconds. We reply within 4 working hours.

Your details stay private. We never share enquiries with third parties.

Other trades we write for

Method statements and risk assessments across the full range of construction activities.

Need concrete & temporary works RAMS that get accepted?

Fixed price, quoted the same day, written to the standard principal contractors review against.