NEBOSH Diploma · CertIOSH · 35 Years UK Construction
Concrete Works & Temporary Works Method Statements & Risk Assessments
Concrete and temporary works RAMS fail most often on the interface with the temporary works procedure — reviewers look for evidence that a Temporary Works Coordinator has been engaged and that designs, checks and permits to load and strike are built into the sequence. A method statement that treats formwork as just another material rarely survives review.
Activities covered
Each document is written for the specific activity, site and programme — not adapted from a template for the trade.
Hazards the assessment must address
- Formwork or falsework collapse during pour
- Premature striking before design strength achieved
- Falls from height at edges, voids and rising formwork
- Concrete pump line blockage and whipping
- Cement burns, dermatitis and eye injury
- Silica dust from cutting, grinding and scabbling
- Reinforcement impalement and protruding bars
- Manual handling of formwork panels and rebar
- Post-tensioning strand release and stressing zone risk
Regulations that apply
Why concrete & temporary works RAMS get rejected
These are the findings that come up repeatedly on the reviewing side for this trade. If your document has been returned, the reason is very likely in this list.
Already been rejected? Send the document and the reviewer's comments. We diagnose exactly why it failed, rewrite it against your site information, and support the resubmission until it is accepted — at no extra charge.
The lifting element people miss
Skips, formwork panels, rebar cages and precast units are all lifted, which brings LOLER 1998 into play. Where the RAMS describes craneage we produce the accompanying lift plan so the two documents agree.
See our lift plan writingGet a quote for concrete & temporary works RAMS
07803 8080933 fields, 30 seconds. We reply within 4 working hours.
Other trades we write for
Method statements and risk assessments across the full range of construction activities.
Need concrete & temporary works RAMS that get accepted?
Fixed price, quoted the same day, written to the standard principal contractors review against.