Site Logistics & Deliveries Method Statements & Risk Assessments
Logistics RAMS are often treated as an administrative formality and then rejected because the vehicle-pedestrian interface is asserted rather than designed. Reviewers want to see a traffic management arrangement that reflects the actual site layout at the actual phase of works.
Activities covered
Each document is written for the specific activity, site and programme — not adapted from a template for the trade.
Hazards the assessment must address
- Vehicle striking pedestrians on site
- Reversing vehicles and blind spots
- Load instability during offloading
- Vehicle overturning on soft or uneven ground
- Falls from vehicles during sheeting and unsheeting
- Public interface at site entrances and on the highway
- Overhead services on delivery routes
- Manual handling during distribution
Regulations that apply
Why site logistics RAMS get rejected
These are the findings that come up repeatedly on the reviewing side for this trade. If your document has been returned, the reason is very likely in this list.
Already been rejected? Send the document and the reviewer's comments. We diagnose exactly why it failed, rewrite it against your site information, and support the resubmission until it is accepted — at no extra charge.
The lifting element people miss
Offloading is the part reviewers most often find missing. A delivery lifted off by lorry loader, telehandler or forklift is a lifting operation under LOLER 1998 and needs planning by a competent person — generic delivery lift plans cover repetitive deliveries efficiently.
See our lorry loader lift plansGet a quote for site logistics RAMS
07803 8080933 fields, 30 seconds. We reply within 4 working hours.
Other trades we write for
Method statements and risk assessments across the full range of construction activities.
Need site logistics RAMS that get accepted?
Fixed price, quoted the same day, written to the standard principal contractors review against.