Demolition & Soft Strip Method Statements & Risk Assessments

Demolition is the most heavily scrutinised RAMS package on most sites, and rightly so — the failure modes are catastrophic and often affect people well outside the working area. Principal contractors expect the document to demonstrate that a competent person has assessed structural stability and sequenced the works accordingly, not simply that the right machine has been booked.

24–48hr turnaround
18-point compliance standard
Resubmission included

Activities covered

Each document is written for the specific activity, site and programme — not adapted from a template for the trade.

Pre-demolition asbestos and refurbishment survey review
Soft strip of fixtures, fittings and non-structural elements
Structural demolition — mechanical, high reach and progressive
Facade retention and temporary propping interfaces
Deconstruction and material segregation
Service isolation, capping and disconnection
Crushing, processing and material removal
Site clearance and slab breakout

Hazards the assessment must address

  • Premature or uncontrolled structural collapse
  • Asbestos-containing materials disturbed during strip out
  • Falls from height at open edges and floor openings
  • Falling debris and material outside the exclusion zone
  • Live services not isolated before works begin
  • Silica dust, lead paint and other hazardous substances
  • Plant stability on debris and unconsolidated ground
  • Noise and vibration affecting operatives and neighbours
  • Fire during hot works and from combustible arisings

Regulations that apply

CDM 2015Regulation 20 — demolition or dismantling must be planned in writing before work begins.
BS 6187:2011Code of practice for full and partial demolition — the reference standard for sequence and method.
Control of Asbestos Regulations 2012Survey, licensed and non-licensed work, notification and NNLW classification.
Work at Height Regulations 2005Open edges, floor openings and access during progressive demolition.
COSHH 2002Silica, lead, and other substances liberated during breaking and stripping.
Control of Noise at Work Regulations 2005Exposure assessment for breaking, crushing and processing.

Why demolition RAMS get rejected

These are the findings that come up repeatedly on the reviewing side for this trade. If your document has been returned, the reason is very likely in this list.

No reference to a structural survey or engineer’s demolition sequence, only a description of plant
Asbestos survey referenced but findings not carried into the method or the risk assessment
Exclusion zones stated as a distance with no justification against structure height or reach
No written demolition plan as required by CDM 2015 Regulation 20 — the RAMS alone offered instead
Service isolation described in the future tense with no permit or evidence route
Progressive collapse and pre-weakening not addressed where high-reach plant is proposed
Dust suppression mentioned without water supply, method or monitoring
No arrangements for unexpected discovery of asbestos or unrecorded structures

Already been rejected? Send the document and the reviewer's comments. We diagnose exactly why it failed, rewrite it against your site information, and support the resubmission until it is accepted — at no extra charge.

The lifting element people miss

Where demolition involves controlled lifting of structural sections, precast panels or plant, that element engages LOLER 1998 and normally needs a written lift plan alongside the RAMS. We produce both as one package so the two documents actually agree with each other.

See our lift plan writing

Get a quote for demolition RAMS

07803 808093

3 fields, 30 seconds. We reply within 4 working hours.

Your details stay private. We never share enquiries with third parties.

Other trades we write for

Method statements and risk assessments across the full range of construction activities.

Need demolition RAMS that get accepted?

Fixed price, quoted the same day, written to the standard principal contractors review against.