Still from the RMT Solutions loading and offloading training film: an excavator lifting a concrete block off a flatbed lorry inside an exclusion zone

Made to your standards · checked by a CPCS A61 Appointed Person

Minimum Standards & Training Videos

Animated training films made to your own minimum standards, site rules and toolbox talks. Every film is built in 3D in your branding, with a professional voice-over, and shows the work done the way your standard says it must be done.

Your standards, your branding, 4K with voice-over

A standard nobody reads cannot keep anyone safe

Minimum standards documents are written carefully and read rarely. On site, people learn from what they see: the toolbox talk, the induction, the way the last job was done. A two-minute film that shows the exclusion zone set out properly, or the red zone around a working excavator, does more than another page in the induction pack.

We are already producing a minimum standards series for a tier 1 main contractor, one film per section of their document. The same service is open to any contractor: watch our own loading and offloading film below to see what one looks like.

What makes them work on site

  • Shows the correct method, checked by a CPCS A61 Appointed Person
  • Your logo on the plant, the hoarding and the PPE
  • A workforce of women and men who look like real people
  • Plain English voice-over, abbreviations spoken in full
  • Short films, one subject each, easy to play at a briefing
  • 4K, so it holds up on a welfare cabin screen or a projector

Four kinds of film

Minimum standards films

One short film for each section of your own health, safety and environmental minimum standards, so the rule in the document and the picture on the screen say the same thing.

  • Made from your document, section by section
  • Your section numbers and wording
  • Shown as it must be done, and what is not permitted

Site induction films

A branded induction for your company or a single site: the site rules, the welfare, the traffic routes and the high-risk activities, the same every time it is played.

  • Your logo, your PPE, your site rules
  • The same message for every new starter
  • Short enough to hold attention

Toolbox talk films

Short films on one hazard at a time, for the supervisor to play at the start of a shift and talk around.

  • Lifting operations and exclusion zones
  • Plant and people segregation, red zones
  • Loading, offloading and working near plant

Lift briefing films

A 3D video of the actual lift, from set-up to set-down, for the lift team to watch before the machine arrives.

  • Included with every RMT lift plan
  • Made from the plan’s own drawings
  • Any lifting device
Drawings and 3D videos with every lift plan

Example training film

Loading and offloading, done safely

Our own example film: planning the delivery, the exclusion zone, safe access onto the vehicle, lifting off under control with a tag line, and what happens when a load cannot come off safely. Yours would carry your branding, your wording and your section numbers.

2 min 8 s.

How a film is made

  1. 1

    Send us the standard

    Your minimum standards document, induction content or the hazard you want covered, in writing. We come back with a quote within 4 working hours.

  2. 2

    Script in plain English

    We write the voice-over script from your wording. Abbreviations are spoken in full, so nobody on site is left guessing. You approve the script before we build anything.

  3. 3

    Built in 3D, in your branding

    The scenes are built with the same 3D tools as our lift plan videos: your logo on the plant and the PPE, and a workforce of women and men who look like real people.

  4. 4

    Voice-over and music

    A professional voice-over and a backing track you approve, so the film sounds as good as it looks.

  5. 5

    Checked and delivered in 4K

    Every method shown is checked by a CPCS A61 Appointed Person with 35 years in lifting before the film goes to you, in 4K.

Price: quoted per job, whether that is one film, a full minimum standards series or a site induction. See our 3D lift plan videos for more of our 3D work.

Frequently Asked Questions

Can you make films of our own minimum standards?

Yes. That is what this service is for. Send us your minimum standards document and we make a film for each section you choose, using your own section numbers and wording.

Will the films carry our branding?

Yes. Your logo goes on the plant, the hoarding and the lift team’s clothing and helmets, and the films open and close on your branding.

What topics can you cover?

Our strongest ground is lifting operations and plant: exclusion zones, red zones around plant, loading and offloading, lifting with excavators, telehandlers and lorry loaders, and practices that are not permitted on site. We also make site induction films covering your general site rules.

Who checks that what the film shows is right?

Every method shown is checked by a CPCS A61 Appointed Person with 35 years in lifting operations and an NCRQ Level 6 Diploma in Applied Health and Safety. The film shows the work done the right way, not a cartoon of it.

How much does a film cost?

Each job is quoted on what it involves: one film, a series covering a whole minimum standards document, or an induction. Send us the content in writing and we will reply with a fixed quote within 4 working hours.

Do I need a separate film for a lift plan?

No. Every lift plan RMT writes already comes with a 3D video of that lift, made from the plan’s own drawings, at no extra cost.

Get a quote for minimum standards or training videos

07803 808093

3 fields, 30 seconds. We reply within 4 working hours.

Delivered to us by email through our form provider and used only to answer you. No mailing list, no marketing. How we handle it.

Call RickyWhatsApp