Lift Plans in Wirral
LOLER compliant lift plans, lift plan checking and Appointed Person services for construction projects across Wirral and Merseyside.
Lift planning across Wirral
Wirral is in the early stages of one of the largest sustained regeneration programmes in the UK — Peel L&P's Wirral Waters masterplan along the Birkenhead docks, alongside Liscard town-centre renewal, the Hind Street regeneration zone and a strong residential pipeline through West Wirral. We deliver lift planning, plan checking, and Appointed Person services to main contractors, specialist lifting firms and steel erectors working across the peninsula.
Wirral sites — particularly along the docks — bring made-ground bearing pressure questions, Mersey wind exposure that materially affects in-service crane derating, and access constraints around the limited dock-road network and the Mersey Tunnel approaches. We are 50 minutes from Birkenhead via the M62 and M53, with same-day site attendance practical for surveys and pre-lift briefings.
From our Warrington base — practical for same-day site visits, surveys, and pre-lift briefings. Standard lift plans turned around within 24-48 hours of receiving project information.
Recent Wirral project experience
- Tower crane Appointed Person contract on a Birkenhead waterfront residential scheme
- Mobile crane lift plans for steel erection on a Wirral Waters commercial block
- Lift plan checking for a tandem pick on a heritage-area refurbishment in Liscard
Services available in Wirral
Every service we offer is available across Merseyside.
Get a quote for Wirral
07803 8080933 fields, 30 seconds. We reply within 24 hours.